We recieved our revised tender and drawings today! With the 5m setback that we wanted, and the sliding door in the bedroom to outside, with our tiles, frosted glass in the front door, and less cost for the driveway because of the setback being shorter
It all looks fantastic and I can't wait til we get contracts and all the approvals out of the way
Tuesday, April 17, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment